Hubbards Contracting Group

Increase profitability through improved water management.
Hubbards Contracting has moved into the era of land levelling by adopting GPS technology. Using Trimble GPS survey equipment and Optisurface design software we can achieve savings of up to 50% compared to conventional laser.
Achieve drainage & irrigation objectives with lower earthworks
- Lowest earthworks & lowest topsoil disturbance
- Eliminate or minimise infield ditches/drains
- Flexible design surface to suit all farming styles (irrigation/dryland).
We are able to survey & design in consultation with the client and perform earthworks.
Case STX 450 & K-Tec pull scraperCase STX 450 & K-Tec pull scraper
Unmatched productivity in bulk out workUnmatched productivity in bulk out work
Trimble Base StateTrimble Base State
Survey, designs and levellingSurvey, designs and levelling
Increased EfficienciesIncreased Efficiencies
GPS machine control on KTEC bucketGPS machine control on KTEC bucket
STX 450 and K Tec scraperSTX 450 and K Tec scraper
Optisurface DesignsOptisurface Designs
Assist with the designAssist with the design
Optisurface DesignsOptisurface Designs
Minimal earthworks requiredMinimal earthworks required
KTEC BucketKTEC Bucket
How to move wet dirtHow to move wet dirt
Optisurface DesignsOptisurface Designs
Save upto 50%Save upto 50%
Dryland DrainageDryland Drainage
Survey VehicleSurvey Vehicle
Dam ConstructionDam Construction
Whole Farm DesignsWhole Farm Designs
Lateral Irrigation DesignsLateral Irrigation Designs
Water Storage SurveyWater Storage Survey
Equipment Available:
- Case STX 535 with K-Tec
- Case STX 535 with Toomey 4500
- Case STX 450 with Toomey 4450
- Versatile 520 with K-Tec
- GPS Survey & Design
- GPS Levelling fitted to all equipment
Water Storage Surveys - Do you know how much water your dam holds?
Services Provided:
- Dam building
- Ring tank restoration
- Ditch pads
- Tail drains/ lateral drains/pivots
- Infield levelling with GPS machine control
- GPS Surveying & Design
- Levelling of melon hole country
- Civil construction pads